Our team have the skills to complete a wide range of work on golf courses. Here we are building retaining walls around a tee box, putting in drainage behind it and the completing a concrete walking path at Huapai Golf. The project is well underway and will continue through next week.
Waitemata Golf Course
February 2026
Waitemata Golf Course is feeling the love this week with the reshaping of a bunker. Reducing size, cleaning edges and a fresh sand fill. At the same time the team are on site they are beginning the construction of a series of new ladies tee boxes. Remove turf, import new material and compact, laser level and then returf.
Central Auckland School
February 2026
A prominent Central Auckland School that Turf and Drainage work with host many of the NRL League teams for training when they visit NZ. To ensure the fields are fit for purpose we were engaged to change the location of the artificial cricket pitch. Turf from the new pitch was carefully removed and used on the old pitch. It was really neat to see the lateral drainage and sand slits in place once we excavated the new location. This type of job usually involves irrigation adjustments and pipe movements as well. And then having a clean finish so the field is back in use as fast as possible.
Hydrowick Drainage installation at Akarana Golf Club
February 2026
A few photos of a Hydrowick Drainage installation at Akarana Golf Club over the last 2 days. A great club to work with and the Turf and Drainage team did an outstanding job as usual.
School Project
December 2025
School is finished and traffic is lighter - this is the perfect time for the Turf and Drainage team to put the foot down!! Over the last 2 days we have had just under 1000t of sand delivered across 3 sites, removed the surface from a 16000m2 sports field platform, scarified and swept over 6ha of ground, cored over 7ha and removed 400m3 of spoil from sites. Men and machines are working in harmony and our customers are happy. What a great way to be as we move into the final working week of the year!!
Natural and Hybrid Turf
December 2025
As well as our teams amazing work on natural and hybrid turf we also have an artificial turf business www.turfcare.co.nz We service tennis courts, daycare centres, hockey and football turf and ensure that it is clean, weedfree and sanitised for safe use. The photos show a typical outcome we achieve.
Turf Replacement at Eden Park
December 2025
Another successful Turf replacement at Eden Park last week post the Metallica Concert. 2am starts for the harvesting crew through to 8pm finishes for the laying crew. Thanks Blair Christiansen Hamish Sutherland Roger Morgan and the whole Turf and Drainage Team for another professional and high quality job.
Hydrowick Drainage
November 2025
And another job completed - dug out, hydrowick drainage installed, stolons spread, edges blended in and sand rolled over the surface. Now we just let the water and fertiliser work its magic and watch this revamped area grow in.
The Hydrowick drainage system
November 2025
The Hydrowick drainage system can also be installed as part of a surface rebuild. The below shots show a private fairway which had ongoing problems around poor sub surface growth media, and poor levels. The Turf and Drainage team are fixing these issues and then laying out the hydrowick prior to redoing the fairway. Incorporating the Hydrowick at this stage and pinning it down prior to adding finishing material above means a fast and efficient install.
Foster Park Rugby 1
October 2025
The Turf and Drainage team are in Rolleston this week installing at Foster Park Rugby 1. This is a high use site and by installing Hydrowick Drainage , the team will be completed in 1 week and the field open for play again immediately. No grow in, no extended closure, almost invisible post install, highly effective and with a 20 year+ life. hashtag
Artificial Cricket Blocks
October 2025
Problem solving is a key part of what the Turf and Drainage team do and the following was a problem. Artificial cricket blocks either sink or the ground around them is built up with ongoing applications of sand and increased organic material, this means it can create a hazard to players and also becomes a catch basin for water. Our solution is to remove the old artificial turf and inject the underside of the block with a 2 pot solution - in this case raising the level by 80mm and then lay new artificial turf on top. 2-4 days per block and a perfect result underway. Sometimes looking at already available solutions and applying them to a different scenario is the best way.
Kristin School
September 2025
Another great message from Kristin School, where our fantastic team maintain all artificial turf on the site. Tennis Courts, Hockey Turf, Kindy, Cricket blocks and nets via our TurfCare team.
Hello Nick and the team, I would like to say at the top of the list of why I am so happy is that we have you maintaining our artificial sports turfs. It’s the outstanding service your company provides - I have never seen our courts look so good in my 24 years at Kristin, the maintenance your team does is perfect. We previously had a company doing a sub-standard job and my turf suffered badly. And then by chance I stumbled upon your website, it was a miracle !!!! Straight away I knew I was on to a brighter future with you and your team. Thank you so much for all your hard work.
Regards, Michelle Koster-Crockford Kristin School
Pakuranga Golf Club
September 2025
A great note from Peter at Pakuranga Golf Club regarding the successful installation of Hydrowick drainage
We installed the Hydrowick system prior to winter this year to a 60 year old green that consistently is near on unplayable during the winter months The results and transformation in the quality of this surface in such a short period is amazing and certainly exceeded our expectations, the product and procedure is a game changer for drainage options Right from the initial consultation to the installation and follow up Turf and Drainage have been a pleasure to deal with
Golf Course Hydrowick
June 2025
Why would you look at any other Golf Course drainage when you can Hydrowick. 800ml completed in 1 day including collector drain, surrounds protected and turf cut then layed back down. Green rolled, mown and back in play the next day with minimal impact. No grow in, reduced water use, better drought resistance and no maintenance. hashtag
Kauri Cliffs
May 2025
The Turf and Drainage team working at one of the more spectacular Golf Courses in the world - Kauri Cliffs. Hydrowick Drainage being installed across a number of fairway and approach areas. Hard work, great team and given the results so far this will be another successful story.